Prof.Dr. Ömer Dinçer First School
It consists of 1 basement + ground floor and 3 normal floors on an area of 5.300 m2. It was delivered in 2014 as a rough construction,
It consists of 1 basement + ground floor and 3 normal floors on an area of 5.300 m2. It was delivered in 2014 as a rough construction,
The project, which consists of 2 basements + ground floor and 4 normal floors on an area of 12,000 m2, was delivered in rough construction in 2014,
The container construction, consisting of 6,000 m2 conventional mold, was delivered in 2008,
The project, which consists of 16 blocks, 128 flats, and 30.000 m2 of conventional formwork, was delivered in full construction in 2011,
It consists of 224 apartments and 12 shops. The rough construction consisting of 40.000 m2 conventional formwork has been delivered completely,
It consists of 3 basements, ground floor and 3 normal floors in an area of 2400 m2, it was delivered in 2014,
3 It was delivered as a regular additional floor in August 2015,
It consists of 100 flats. The rough construction consisting of 18.000 m2 conventional formwork was delivered in 2011,
It consists of 1 basement floor + ground floor and 5 foundation floors in an area of 10.000 m2, it was delivered in rough construction in 2104,
2 basement floors + ground floor + 16 normal floors business center project on 21.000 m2 area was delivered in 2014 as rough construction,