Mehmet Arısoy Fabrika
8000 m2 alana 1 bodrum kat + zemin kat ve 3 normal kattan oluşmaktadır, 2015 yılında kaba inşaat olarak teslim edilmiştir
Talat Gökler İş Merkezi
It consists of 3 basement floors + ground floor and 5 normal floors on an area of 8000 m2.
Tasarımcılar İş Merkezi
The container construction, consisting of 6,000 m2 conventional mold, was delivered in 2008,
Ayhan Sevimsiz İş Merkezi
3 It was delivered as a regular additional floor in August 2015,
Akay Plastik Fabrika
Our Akap Plastic Factory, located in Istanbul Esenyurt Akçaburgaz location, consists of 3 basement floors + ground floor and 1 normal floor established on an area of 4500 m². Our construction, which has a total construction area of 40.000m², was delivered in 2016